Answered step by step
Verified Expert Solution
Link Copied!

Question

1 Approved Answer

The projected cost of a lamp is calculated based upon the projected increases or decreases to current costs. The present costs to manufacture one lamp

image text in transcribedimage text in transcribed

The projected cost of a lamp is calculated based upon the projected increases or decreases to current costs. The present costs to manufacture one lamp are: Lamp Kit: Direct Labor Variable Overhead: Fixed Overhead: $16.0000000 per lamp 2.0000000 per lamp (4 lamps/hr.) 2.0000000 per lamp 10.0000000 per lamp (based on normal capacity of 25,000 lamps) Cost per lamp: $30.0000000 per lamp Expected increases for 20x2 When calculating projected increases round to TWO ($0.00) decimal places. 1. Material Costs are expected to increase by 2.00%. 2. Labor Costs are expected to increase by 5.50%. 3. Variable Overhead is expected to increase by 4.00%. 4. Fixed Overhead is expected to increase to $265,000. 5. Fixed Administrative expenses are expected to increase to $50,000. 6. Variable selling expenses (measured on a per lamp basis) are expected to increase by 5.50%. 7. Fixed selling expenses are expected to be $29,000 in 20x2. 8. Variable administrative expenses (measured a per lamp basis) are expected to increase by 5.00%. On the following schedule develop the following figures: 1- 20x2 Projected Variable Manufacturing Unit Cost of a lamp. 2- 20x2 Projected Variable Unit Cost per lamp. 3- 20x2 Projected Fixed Costs. Vanable Manufacturing Unit Cost 20x1 Cost Projected Percent Increase 20x2 Cost Rounded to 2 Decimal Places Lamp Kit Labor Variable Overhead (4.01) {4.02) {4.03) Projected Variable Manufacturing Cost Per Unit {4.04) Total Variable Cost Por unk 20x1 Cost Projected Percent Increase 20x2 Cost Rounded to 2 Decimal Places Variable Selling Variable Administrative Projected Variable Manufacturing Unit Cost {4.05} You entered 1.055 please round to 2 places, -round($#%##,2) 14.06) {4.04) Projected Total Variable Cost Per Unit (4.07) Schedule of Fixed Costs 20x1 Cost 20x2 Cost Projected Percent Increase $ {4.08) Fixed Overhead (normal capacity of Fixed Selling Fixed Administrative lamps @ $ $ (4.09) {4.10 Projected Total Fixed Costs $

Step by Step Solution

There are 3 Steps involved in it

Step: 1

blur-text-image

Get Instant Access to Expert-Tailored Solutions

See step-by-step solutions with expert insights and AI powered tools for academic success

Step: 2

blur-text-image

Step: 3

blur-text-image

Ace Your Homework with AI

Get the answers you need in no time with our AI-driven, step-by-step assistance

Get Started

Recommended Textbook for

Working Papers Volume 1 To Accompany Weygandt Financial And Managerial Accounting

Authors: Jerry J. Weygandt, Paul D. Kimmel, Donald E. Kieso

1st Edition

1118233468, 978-1118233467

More Books

Students also viewed these Accounting questions