The Steelie Dan Company produces a component that is subsequently used in the aerospace industry. The component consists of three parts (A, B, and C)

The Steelie Dan Company produces a component that is subsequently used in the aerospace industry. The component consists of three parts (A, B, and C) that are purchased from outside and cost 40, 35, and 15 cents per piece, respectively. Parts A and B are assembled first on assembly line 1, which produces 170 components per hour. Part C undergoes a drilling operation before being finally assembled with the output from assembly line 1. There are in total six drilling machines, but at present only three of them are operational. Each drilling machine drills part C at a rate of 70 parts per hour. In the final assembly, the output from assembly line 1 is assembled with the drilled part C. The final assembly line produces at a rate of 190 components per hour. At present, components are produced eight hours a day and five days a week. Management believes that if need arises, it can add a second shift of eight hours for the assembly lines. The cost of assemble labor is 30 cents per part for each assembly line; the cost of drilling labor is 10 cents per part. For drilling the cost of electricity is two cent per part. The total overhead cost has been calculated as $1,100 per week. The depreciation cost for equipment has been calculated as $30 per week.

a. Using the process flow diagram below determine the process capacity (number of components produced per week) of the entire process. A.

Diagram:

  1. Suppose a second shift of eight hours is run for assembly line 1 and the same is done for the final assembly line. In addition, four of the six drilling machines are made operational. The drilling machines, however, operate for just eight hours a day. What is the new process capacity (number of components produced per week)? Which of the three operations limits the capacity.

  1. Management decides to run a second shift of eight hours for assembly line1 plus a second shift of only four hours for the final assembly line. Five of the six drilling machines operate for eight hours a day. What is the new capacity? Which of the three operations limits the capacity?

d. Determine the cost per unit output for questions (b) and (c).

Item

Calculation

Cost

Cost of part A

Cost of part B

Cost of part C

Electricity

Assembly 1 labor

Final assembly labor

Drilling labor

Overhead

Depreciation

Total Cost

Cost per unit =

Item

Calculation

Cost

Cost of part A

Cost of part B

Cost of part C

Electricity

Assembly 1 labor

Final assembly labor

Drilling labor

Overhead

Depreciation

Total

Cost per unit=

e. The product is sold at $3.00 per unit. Assume that the cost of a drilling machine (fixed cost) is $30,000 and the company produces 8,000 units per week. Assume that four drilling machines are used for production. If the company had an option to buy the same part at $3.00 per unit, what would be the break-even number

Step by Step Solution

There are 3 Steps involved in it

Step: 1

blur-text-image

Get Instant Access to Expert-Tailored Solutions

See step-by-step solutions with expert insights and AI powered tools for academic success

Step: 2

blur-text-image

Step: 3

blur-text-image

Ace Your Homework with AI

Get the answers you need in no time with our AI-driven, step-by-step assistance

Get Started

Recommended Textbook for

Patient Care Audit Criteria

Authors: Jean Gayton Carroll

1st Edition

0870943928, 978-0870943928

More Books

Students also viewed these Accounting questions

Question

=+ (b) Do the same for p = 2.

Answered: 1 week ago