Question
The Weinberger Electronics Corporation manufactures four highly technical products that it supplies to aerospace forms that hold NASA contract. Each of the products must pass
The Weinberger Electronics Corporation manufactures four highly technical products that it supplies to aerospace forms that hold NASA contract. Each of the products must pass through the following departments before they are shipped: wiring, drilling, assembly, and inspection. The time requirement in hours for each unit produced and its corresponding profit value are summarized in the following table:
Product | Department | Unit profit | |||
Wiring | Drilling | Assembly | Inspection | ||
XJ201 | 0.5 | 0.3 | 0.2 | 0.5 | 9 |
XM897 | 1.5 | 1 | 4 | 1 | 12 |
TR29 | 1.5 | 2 | 1 | 0.5 | 15 |
BR788 | 1 | 3 | 2 | 0.5 | 11 |
The production available in each department each month, and the minimum monthly production requirement to fulfill contracts, are as follows:
Department | Capacity (hours) | Product | Minimum Prod. Level | |
Wiring | 15,000 | XJ201 | 150 | |
Drilling | 17,000 | XM897 | 100 | |
Assembly | 26,000 | TR29 | 300 | |
Inspection | 12,000 | BR788 | 400 |
Question # 40. The production manager has the responsibility of specifying production levels for each product for the coming month. Help him by formulating ( that is, setting up the constraints and objective function) Weinbergers problem using LP in an Excel spread sheet and an summary explanation.
Step by Step Solution
There are 3 Steps involved in it
Step: 1
Get Instant Access to Expert-Tailored Solutions
See step-by-step solutions with expert insights and AI powered tools for academic success
Step: 2
Step: 3
Ace Your Homework with AI
Get the answers you need in no time with our AI-driven, step-by-step assistance
Get Started