Answered step by step
Verified Expert Solution
Link Copied!

Question

1 Approved Answer

There is a 3 percent error rate at a specific point in a production process. If an inspector is placed at this point, all the

There is a 3 percent error rate at a specific point in a production process. If an inspector is placed at this point, all the defects can be detected and eliminated. The inspector would cost $11 per hour and could inspect units in the process at the current production rate of 52 per hour.
If no inspector is hired and defects are allowed to pass this point, there is a cost of $12 per defective unit to correct the defects later on.
Assume that the line will operate at the same rate (i.e., the current production rate) regardless of whether the inspector is hired or not.
a. If an inspector is hired, what will be the inspection cost per unit? (Round your answer to 3 decimal places.)
b. If an inspector is not hired, what will be the defective cost per unit? (Round your answer to 3 decimal places.)
c. Should an inspector be hired based on costs alone?
multiple choice
Yes
No

Step by Step Solution

There are 3 Steps involved in it

Step: 1

blur-text-image

Get Instant Access to Expert-Tailored Solutions

See step-by-step solutions with expert insights and AI powered tools for academic success

Step: 2

blur-text-image_2

Step: 3

blur-text-image_3

Ace Your Homework with AI

Get the answers you need in no time with our AI-driven, step-by-step assistance

Get Started

Recommended Textbook for

Essentials Of Management Information Systems

Authors: Ken Laudon, Kenneth C Laudon

10th Edition

0133033090, 9780133033090

More Books

Students also viewed these General Management questions