This assignment is Part 2 of the Denver International Airport (DIA) case study. It will deal with the Logic Network Diagram. For the baggage handling
This assignment is Part 2 of the Denver International Airport (DIA) case study. It will deal with the Logic Network Diagram. For the baggage handling system tasks listed in your WBS (DIA BHS), you and your team will:
- Develop the logic network for the baggage handling system tasks
- Determine the dependencies among the tasks.
- Find the Critical Path for this portion of the effort
It is preferred that you use Microsoft Project, but it is also acceptable to use Microsoft Excel or Microsoft Word. Please follow the principles of WBS structure that we went over in class.
Baggage Handling System Work Breakdown Structure Level 1-3 BHS WBS - Baggage Handling System Level 1 1.0 BHS WBS Scanning & Transportation Communications Operator Control Integration Level 2 Tracking Operations Subsystem Subsystem Subsystem Subsystem and Test Subsystem 1.7 1.1 1.2 1.3 1.4 1.6 1.5 BHS WBS Level 3 Carts Track Power System Integration & Test 1.1.1 1.1.2 1.1.3 1.1.4 Develop a Work Breakdown Structure (WBS) for development of the DIA Baggage Handling System to at least five levels (starting with DIA - BHS = level 2). Remember you will be linking these into a logic networkStep by Step Solution
There are 3 Steps involved in it
Step: 1
Get Instant Access to Expert-Tailored Solutions
See step-by-step solutions with expert insights and AI powered tools for academic success
Step: 2
Step: 3
Ace Your Homework with AI
Get the answers you need in no time with our AI-driven, step-by-step assistance
Get Started