Consider a tire factory simulation. Factory has 3 shifts, working 24 hours a day and 7 days a week. The cycle time is the
Consider a tire factory simulation. Factory has 3 shifts, working 24 hours a day and 7 days a week. The cycle time is the parameter of interest. An initial R-10 replications, each with a total run length (that is the initialization phase plus the data collection phase) of 5991 hours are conducted. The initialization phase is taken as 1/10 of the total run length. Suppose that it is desired to estimate long-run mean cycle time to within E=0.1 hours with 95% confidence. Then, you calculated that an initial estimate of 95 replications will be needed. However, for some reason you decided to increase the total run length within each replication instead of additional replications. What should be the length of the initialization phase to achieve specified accuracy without conducing additional replications? Use hours as simulation time unit in your answer. Answer:
Step by Step Solution
★★★★★
3.45 Rating (155 Votes )
There are 3 Steps involved in it
Step: 1
To achieve the specified accuracy without conducting additional replications we need to adjust the l...Get Instant Access to Expert-Tailored Solutions
See step-by-step solutions with expert insights and AI powered tools for academic success
Step: 2
Step: 3
Ace Your Homework with AI
Get the answers you need in no time with our AI-driven, step-by-step assistance
Get Started