Question

1 Approved Answer

Problem 2B: This problem is the same as Problem 2A except that there are 16 machines of type M2. Re-work the problem assuming that

Problem 2B: This problem is the same as Problem 2A except that there are 16 machines of typeM2. Re-work the problem assuming


Problem 2A: A company produces two products P1, and P2 at the rate of 7200, and 8900 unitsper month. Three components C1, C2


Table 1unit requirementsC1 C2 C3P1 4 2 3P2 3 2 0Table 2time in minutes per unitC1 C2 C3M1 6.96.4 6.2M24.8  
 

Problem 2B: This problem is the same as Problem 2A except that there are 16 machines of type M2. Re-work the problem assuming that machines of type M2 can process only C2 items and nothing else, and try to answer questions 3 through 9. Obviously, your answers to questions 3, 4, and 5 will be the same as before, but for questions 6 through 9. they will be different. ****You may expect a problem similar to this on the second test or the final examination. **** (6b) The maximum number of C2 items that can be produced on the 16 machines of type M2 per month is: (A) 28,600 (B) 35,200 (C) 37,600 (D) 38,800 (E) none of the above (7b) All the C2 items needed per month can be produced on the available machines of type M2. (C) not enough information (A) True (B) False (8b) The number of hours (rounded-up) needed on machines of type M1 to produce the remaining number of C2 items, if any, and all of C1 and C3 items is: (B) 8086 (D) 8999 (E) none of the above (9b) The number of machines of type M1 needed to produce the remaining (A) 7092 (C) 8615 number of C2 items, if any, and all of C1 and C3 items is: (A) 42 (B) 44 (C) 49 (D) 52 (E) none of the above Problem 2A: A company produces two products P1, and P2 at the rate of 7200, and 8900_units per month. Three components C1, C2, and C3 are used in making a unit of each of the products. The component requirements for each unit of the product are given in Table 1. The time required (in minutes) to make a unit of each of these components on the two machines is given in Table 2. The machines are available for 22 days, 8 hours a day, in a month to do production work. Currently, there are 50 machines of type M1, and 13 machines of type M2 available in the workshop. Machines of type M2 are used to produce only C2 items. Machines of type M1 can be used to produce any of the three components. Do we have enough capacity to produce all the components in a month? (Hint: First, calculate the required rate of production for each of the components. Determine the maximum number of C2 items that can be produced on the 13 machines of type M2. Then calculate the number of hours and machines of type M1 needed to produce the remaining number of C2 items, if any, and all of C1 as well as C3 items.) Table 1 unit requirements C1 C2 C3 4 3 Pl P2 2 3 2 0 Table 2 time in minutes per unit C1 C2 C3 6.9 6.4 6.2 4.8 M1 M2

Step by Step Solution

3.46 Rating (162 Votes )

There are 3 Steps involved in it

Step: 1

blur-text-image

Get Instant Access to Expert-Tailored Solutions

See step-by-step solutions with expert insights and AI powered tools for academic success

Step: 2

blur-text-image

Step: 3

blur-text-image

Ace Your Homework with AI

Get the answers you need in no time with our AI-driven, step-by-step assistance

Get Started

Recommended Textbook for

Cornerstones of Managerial Accounting

Authors: Mowen, Hansen, Heitger

3rd Edition

324660138, 978-0324660135

More Books

Students also viewed these Accounting questions

Question

What do you think?

Answered: 1 week ago