This problem related to Manufacturing Systems subject. Production is set to occur on a two - machine line with deterministic processing times and geometric repair
This problem related to Manufacturing Systems subject.
Production is set to occur on a twomachine line with deterministic processing times and geometric
repair and failure times, with operationdependent failures. The operation time is minute per
machine. The mean time to failure of each machine is hours and minutes.The mean down time
is hour, minutes, and seconds.
Part
Calculate the production rate of the following lines in parts per minute.
a What is the production rate of a zerobuffer line?
b What is the production rate of an infinite buffer line?
Answer in decimal places.
Part
Assume the factory works weeks, with hours per week on average.
a What is the smallest buffer that allows an expected production rate of itemsyear
Round to the nearest integer.
Part
The factory gets $ for each item sold, and it costs $ to hold an item in inventory.
a What is the profit if the factory sizes the buffer to make units?
b What is the optimal buffer size for maximizing profit?
c What is the optimal profit?
Round to the nearest integer.
Step by Step Solution
There are 3 Steps involved in it
Step: 1
Get Instant Access to Expert-Tailored Solutions
See step-by-step solutions with expert insights and AI powered tools for academic success
Step: 2
Step: 3
Ace Your Homework with AI
Get the answers you need in no time with our AI-driven, step-by-step assistance
Get Started