Tim y. Ibrahim, Samuel and Sondos are working on a compiler to ease work flow in a particular Semester project. Ibrahim's design has execution length
Tim y. Ibrahim, Samuel and Sondos are working on a compiler to ease work flow in a particular Semester project. Ibrahim's design has execution length of 600 secs Samuel's proposal suggests a single data path which has the capacity to generate 300Billion dynamic instru per execution Sondos finally comes up with a pipelined path having 1.2ns clock period. Her proposal has the capacity to generate 400 Billion instructions. 25% of which are loads and 20% are branches. 40% of all loads cause a 2-cycle stall. The penalty for mis-predicting a branch is 5-cycles. No further stalls plus. nestion: If Samuel wants his compiler to run faster than Ibrahim's, how fast does Samuel need to make his clock 1 A- BI Say. Ibrahim, Samuel and Sondos are working on a compiler to ease work flow in a particular Semester project. Ibrahim's design has execution length of 600 secs Samuel's proposal suggests a single data path which has the capacity to generate 300 Billion dynamic instructions per execution Sondos finally comes up with a pipelined path having 1.2ns clock period. Her proposal has the capacity to generate 400Billion instructions. 25% of which are loads and 20% are branches. 40% of all loads cause a 2-cycle use stall. The penalty for mis-predicting a branch is 5-cycles. No further stalls plus. Question: If Samuel wants his compiler to run faster than Ibrahim's, how fast does Samuel need to make his clock cycle
Step by Step Solution
There are 3 Steps involved in it
Step: 1
Get Instant Access to Expert-Tailored Solutions
See step-by-step solutions with expert insights and AI powered tools for academic success
Step: 2
Step: 3
Ace Your Homework with AI
Get the answers you need in no time with our AI-driven, step-by-step assistance
Get Started