Answered step by step
Verified Expert Solution
Link Copied!

Question

1 Approved Answer

Tommy applying for a production supervisory position at the Bimbo Bakeries local operating division. Bimbo is a global leader in the bakery industry, and had

Tommy applying for a production supervisory position at the Bimbo Bakeries local operating division. Bimbo is a global leader in the bakery industry, and had an interview with the HR VP, Ms. Harlop. She wanted to know a bit more about Tommys qualifications. Tommy got invited to spend a day on the production floor in Horsham, PA.
They were running a key product that day, and the line foreman, Michael T. asked Tommy if their production line is in control. A special whole grain dinner rolls on the schedule. Tommy collected random samples and weighed them, from 6 am on. Every hour he collected 5 random rolls, at various conveying belt locations .. Over the 6 hours (6 am to 12 pm). The data collected shown below.
Hours
Sample # 1
Sample # 2
Sample # 3
Sample # 4
Sample # 5
6 am
6.5
5.9
5.8
6.2
6.7
7 am
5.9
6.4
5.9
5.8
5.5
8 am
7.7
6.3
7.0
6.9
6.0
9 am
6.4
5.9
5.8
6.5
6.7
10 am
6.5
6.1
6.7
5.9
6.7
11 am
7.9
7.7
7.5
8.1
7.3
What is the sample size, n =?
5
Total samples Tommy collected
30
What is the Upper Control Limit for weight, x-bar
7.20
What is the Lower Control Limit for weight, x -bar
5.31
What is the Upper Control Limit for range, R
3.95
What is the Lower Control Limit for range, R
0.00
Is the process under control
[ Select ]
How many point(s) out of control
[ Select ]
Is Range chart in control
[ Select ]

Step by Step Solution

There are 3 Steps involved in it

Step: 1

blur-text-image

Get Instant Access with AI-Powered Solutions

See step-by-step solutions with expert insights and AI powered tools for academic success

Step: 2

blur-text-image

Step: 3

blur-text-image

Ace Your Homework with AI

Get the answers you need in no time with our AI-driven, step-by-step assistance

Get Started

Students also viewed these General Management questions