TRAINING AND DEVELOPMENT A wood manufacturing plant produced panels that contractors use as building materials. The plant employed 300 workers, 48 supervisors, 7 shift superintendents
TRAINING AND DEVELOPMENT
A wood manufacturing plant produced panels that contractors use as building materials. The plant employed 300 workers, 48 supervisors, 7 shift superintendents and a plant manager. The business had several problems. First, two percent of the wood panels produced each day were rejected because of poor quality. Second, the production area was experiencing poor housekeeping, such as improperly stacked finished panels that would fall and be damaged or injure employees. Third, the number of preventable accidents was higher than the industry average. The metrics (measures) of these problems before training are outlined in Table 1.
To correct these problems, the plant manager, shift superintendents and supervisors participated in training in (1) performance management and interpersonal skills related to quality problems and poor work habits of employees and (2) rewarding employees for performance improvement. The training was delivered in a low cost facility close to the plant by company trainers. The costs to design and deliver the training were calculated in five categories: direct costs, indirect costs, development costs, overhead costs, and compensation costs. Calculate the costs of the training in Table 2 (note some of the rows have been calculated for you - you need to calculate all of the others). Round your calculations to the nearest dollar.
After training the same metrics were used to see if the training had been worthwhile. The results are noted in Table 1. Use these to calculate the change from before the training to after the training. Complete the Performance Improvements column. Make sure that you calculate BOTH the monetary and non-monetary performance improvements for Quality of Wood Panels and Preventable Accidents.
Table 1 Business Problems Before and After Training
Performance Results | Metric | Results Before Training | Results After Training | Performance Improvement |
Quality of Wood Panels | # of defects $ cost of defects | 10/day $518,400/yr | 2/day $345,600/yr |
|
Preventable Accidents | # of accidents $ cost of accidents | 24/yr $144,000/yr | 16/yr $96,000/yr |
|
Table 2 Training Costs
Direct Costs | $ |
Internal trainer salaries (12 days @$300/day) |
|
Benefits (25% of salary) |
|
Travel expenses | 0 |
Materials ($60/trainee) |
|
Audio visual equipment rental (12 days @$50/day) |
|
Refreshments ($10/day x 3 days/trainee) |
|
Total Direct Costs |
|
Indirect Costs |
|
Training management | 0 |
Clerical and administrative salaries | 750 |
Benefits (25% of salary) |
|
Postage, shipping, telephone | 0 |
Pre-training materials ($4/trainee) |
|
Total indirect costs |
|
Development Costs |
|
Training program license fee | 3,600 |
Registration fees | 1,400 |
Travel expenses | 975 |
Trainer salaries | 625 |
Benefits (25% of salary) |
|
Total development costs |
|
Overhead Costs |
|
General organizational support, top management time (10% of direct, indirect and development costs) |
|
Total overhead costs |
|
Trainee Compensation |
|
Trainees salaries and benefits (based on time away from job) | 16,969 |
Total training costs |
|
Step by Step Solution
There are 3 Steps involved in it
Step: 1
Get Instant Access to Expert-Tailored Solutions
See step-by-step solutions with expert insights and AI powered tools for academic success
Step: 2
Step: 3
Ace Your Homework with AI
Get the answers you need in no time with our AI-driven, step-by-step assistance
Get Started