Question
Two girder designs are under consideration for a bridge to cross a span of 1,350 feet. The first design is expected to result in superstructure
Two girder designs are under consideration for a bridge to cross a span of 1,350 feet. The first design is expected to result in superstructure weight per foot of 14(S)+1,500. The second should result in a superstructure weight per foot of 17(S)+1250, where S is the span between piers. Piers and the two required abutments are estimated to cost $200,000 each. The superstructure will be erected at a cost of $0.60 per pound.
1. Which girder design should you choose based on optimum cost?
2. What are the optimum number of piers for this design?
3. What is the optimum cost for this design in dollars?
Step by Step Solution
There are 3 Steps involved in it
Step: 1
Get Instant Access with AI-Powered Solutions
See step-by-step solutions with expert insights and AI powered tools for academic success
Step: 2
Step: 3
Ace Your Homework with AI
Get the answers you need in no time with our AI-driven, step-by-step assistance
Get Started