Question
Two methods are being evaluated for constructing a second story floor onto an existing building at the Pentagon. Method A will use lightweight expanded shale
Two methods are being evaluated for constructing a second story floor onto an existing building at the Pentagon. Method A will use lightweight expanded shale on a metal deck with open web joists and steel beams. For this method, the sots will be $14100 for concrete, $6000 for metal decking, $4300 for joists, and $2600 for beams. Method B will be a reinforced concrete slab that will cost $5200 for concrete, $1400 for rebar, $2600 for equipment rental and $1200 for expendable supplies. Special additives will be included in the lightweight concrete that will improve the heat transfer properties of the floor. If the energy costs for method A will be $600 per year lower than for method B, which one is more attractive at an interest rate of 7% per year over a 20 year study period? Use the B/C method.
Step by Step Solution
3.42 Rating (168 Votes )
There are 3 Steps involved in it
Step: 1
Get Instant Access to Expert-Tailored Solutions
See step-by-step solutions with expert insights and AI powered tools for academic success
Step: 2
Step: 3
Document Format ( 2 attachments)
635d975e7ad8f_177056.pdf
180 KBs PDF File
635d975e7ad8f_177056.docx
120 KBs Word File
Ace Your Homework with AI
Get the answers you need in no time with our AI-driven, step-by-step assistance
Get Started