Answered step by step
Verified Expert Solution
Question
1 Approved Answer
TWO-Stage ABC for Manufacturing Detroit Foundry, a large manufacturer of heavy equipment components, has determined the following activity cost pools and cost driver levels for
TWO-Stage ABC for Manufacturing Detroit Foundry, a large manufacturer of heavy equipment components, has determined the following activity cost pools and cost driver levels for the year: Activity Cost Pool Activity Cost Activity Cost Driver Machine setup $684,000 12.000 setup hours Material handling 204,000 2,000 material moves Machine operation 500,000 10,000 machine hours The following data are for the production of single batches of two products, C23 Cams and U2 Shafts during the month of August: Units produced Machine hours Direct labor hours Direct labor cost Direct materials cost Tons of materials Setup hours 023 Cams U2 Shafts 500 300 4 200 400 $9,000 $14,000 $34,000 $24,000 13 Determine the unit costs of C23 Cams and U2 Shafts using ABC. Round cost per gallon to two decimal places. Product Costs C23 Cams U2 Shafts Direct materials $ 34,000 $ 24,000 Direct labor 9,000 14,000 Manufacturing overhead: Machine setups Material handling Machine operation Total job costs Units produced Cost per unit produced $ S
Step by Step Solution
There are 3 Steps involved in it
Step: 1
Get Instant Access to Expert-Tailored Solutions
See step-by-step solutions with expert insights and AI powered tools for academic success
Step: 2
Step: 3
Ace Your Homework with AI
Get the answers you need in no time with our AI-driven, step-by-step assistance
Get Started