Answered step by step
Verified Expert Solution
Question
1 Approved Answer
tWu prOu for the Support department cost allocation; departmental overhead rates; product costing: manufacturer Opticon Ltd is developing departmental overhead rates based on machine hours
tWu prOu for the Support department cost allocation; departmental overhead rates; product costing: manufacturer Opticon Ltd is developing departmental overhead rates based on machine hours for its moulding department rates predetermined manufacturing overhead P7 partment. The moulding department has 20 machines that each 2000 hours per LO7.10 and direct labour hours for its assembly de run for 2000 hours per year. The assembly department employs 80 people, who each work year. The production-related overhead costs distributed to the moulding and assembly departments are budgeted at $500000 and $740000, respectively. Two support departments, repairs and engineering directly support the two production departments, moulding and assembly. These support departments have budgeted costs of $100000 and $580000, respectively. The production departments' overhead rates cannot be determined until the support department costs are allocated. The following schedule reflects use of the output of the repairs and engineering departments by the various departments. Support departments Repairs (repair hours) Engineering (kilowatt hours) Repairs Engineering Moulding 3 000 850 000 Assembly 15 000 150 000 2 000 250 000 0 Required: 1. (a) Calculate the overhead rates per machine hour for the moulding department and per direct labour hour for the assembly department. Use the direct method to allocate support department costs Estimate the overhead cost of a doodad, which is produced using 3 machine hours in the moulding department and 5 labour hours in the assembly department. (b) 2. (a) Calculate the overhead rates per machine hour for the moulding department and per direct labour hour for the assembly department. Use the step-down method to allocate support department costs Allocate the repairs department costs first. (b) Now estimate the overhead cost of the doodad using the overhead rates estimated in part 2(a)
Step by Step Solution
There are 3 Steps involved in it
Step: 1
Get Instant Access to Expert-Tailored Solutions
See step-by-step solutions with expert insights and AI powered tools for academic success
Step: 2
Step: 3
Ace Your Homework with AI
Get the answers you need in no time with our AI-driven, step-by-step assistance
Get Started