Answered step by step
Verified Expert Solution
Question
1 Approved Answer
Us addendum below Fast plz After completing the required time study for the engineering company (Question 1) you have noted that the company does not
Us addendum below
Fast plz
After completing the required time study for the engineering company (Question 1) you have noted that the company does not analyse any of its work processes surrounding the machine support activities, you have collected the following data on the process on the shop floor where a support operator assists the machine operator in question 1. Note: The support operator (serviceman) services seven machines in the department and you have calculated that one metre is equivalent to 1.2 seconds. Here is the information you have collected on the task: Checks stock availability of all machines on start-up (14 minutes), waits for supervisor to get the daily production requirements (6 minutes), goes to stores (350 metres), informs storeman of daily requirements (3 minutes), returns to production department, looks for scrap trolley (8 minutes), collects all scrap material from machines (8 minutes), takes scrap material to waste area (550 metres), returns scrap trolley to designated area (450 metres), get material trolley from designated area (60 metres) return to stores to collect 1st order (350 metres), waits for order (5 minutes), loads order onto trolley (15 minutes), and returns, unload 20 metal strips and placed at each machine (20 minutes per machine), returns material trolley (130 metres), returns to machines (200 metres), collect scrap at each machine and put in allocated scrap area for each machine (5 minutes per machine) gets scrap trolley to designated area (30 metres), collects all scrap material from machines (8 minutes), takes scrap material to waste area (550 metres), return scrap trolley to designated area (450 metres), gets material trolley from designated area (60 metres) return to stores to collect and order (350 metres), loads order onto trolley (5 minutes), and returns, unload 20 metal strips and placed at each machine (20 minutes per machine), returns material trolley (130 metres). 3.1 Use "Addendum C" and complete the chart on the information collected. (10) 3.2 Suggest improvements and calculate the savings (4) SINGLE COLUMN PROCESS SHEET STEP DETAILS OF NO OPERATION OPE INS DEL TRASTO DISTANCE TIME REMARKS SUMMARY TOTAL NO OF STEPS TRANSPORT STORAGES OPEATION INSPECTION DELAYS NO NO NO TIME TIME TIME NO DISTANCE OLD METHODStep by Step Solution
There are 3 Steps involved in it
Step: 1
Get Instant Access to Expert-Tailored Solutions
See step-by-step solutions with expert insights and AI powered tools for academic success
Step: 2
Step: 3
Ace Your Homework with AI
Get the answers you need in no time with our AI-driven, step-by-step assistance
Get Started