Answered step by step
Verified Expert Solution
Link Copied!

Question

1 Approved Answer

Us addendum below Fast plz After completing the required time study for the engineering company (Question 1) you have noted that the company does not

image text in transcribed

Us addendum below

image text in transcribed

Fast plz

After completing the required time study for the engineering company (Question 1) you have noted that the company does not analyse any of its work processes surrounding the machine support activities, you have collected the following data on the process on the shop floor where a support operator assists the machine operator in question 1. Note: The support operator (serviceman) services seven machines in the department and you have calculated that one metre is equivalent to 1.2 seconds. Here is the information you have collected on the task: Checks stock availability of all machines on start-up (14 minutes), waits for supervisor to get the daily production requirements (6 minutes), goes to stores (350 metres), informs storeman of daily requirements (3 minutes), returns to production department, looks for scrap trolley (8 minutes), collects all scrap material from machines (8 minutes), takes scrap material to waste area (550 metres), returns scrap trolley to designated area (450 metres), get material trolley from designated area (60 metres) return to stores to collect 1st order (350 metres), waits for order (5 minutes), loads order onto trolley (15 minutes), and returns, unload 20 metal strips and placed at each machine (20 minutes per machine), returns material trolley (130 metres), returns to machines (200 metres), collect scrap at each machine and put in allocated scrap area for each machine (5 minutes per machine) gets scrap trolley to designated area (30 metres), collects all scrap material from machines (8 minutes), takes scrap material to waste area (550 metres), return scrap trolley to designated area (450 metres), gets material trolley from designated area (60 metres) return to stores to collect and order (350 metres), loads order onto trolley (5 minutes), and returns, unload 20 metal strips and placed at each machine (20 minutes per machine), returns material trolley (130 metres). 3.1 Use "Addendum C" and complete the chart on the information collected. (10) 3.2 Suggest improvements and calculate the savings (4) SINGLE COLUMN PROCESS SHEET STEP DETAILS OF NO OPERATION OPE INS DEL TRASTO DISTANCE TIME REMARKS SUMMARY TOTAL NO OF STEPS TRANSPORT STORAGES OPEATION INSPECTION DELAYS NO NO NO TIME TIME TIME NO DISTANCE OLD METHOD

Step by Step Solution

There are 3 Steps involved in it

Step: 1

blur-text-image

Get Instant Access to Expert-Tailored Solutions

See step-by-step solutions with expert insights and AI powered tools for academic success

Step: 2

blur-text-image

Step: 3

blur-text-image

Ace Your Homework with AI

Get the answers you need in no time with our AI-driven, step-by-step assistance

Get Started

Recommended Textbook for

Structured Edp Auditing

Authors: Gabriel Rothberg

1st Edition

0534979319, 978-0534979317

More Books

Students also viewed these Accounting questions