Using the PN2023 BAA Retail / Office Complex Plan Pack and documentation, carry out the following tasks to check and assess the structural adequacy of
Using the PN2023 BAA Retail / Office Complex Plan Pack and documentation, carry out the following tasks to check and assess the structural adequacy of the building.
Using the BAA project plans, specifications and documentation, and the information below, calculate the total load on the column pad footing at Grid D2.
- Wind load to the roof: 1.2kPa
- Live load to the roof: 0.5kPa
- Roof Sheeting, Purlins, insulation, fixing and bracing, allow 17.5 kg/m2
- Use the internet to research the weight of the rafter and column elements of the structure
- 250 UB 37.3 Rafter
- Universal Column 310 UC 137
- Reinforced concrete density 2400 kg/m3
2.Using the determination calculated above and the project documentation, identify whether the footing size is sufficient to meet the structural requirements
3.Analyse the stability of the soil to support the construction load and if the footing is found not to be sufficient, then calculate the ideal size for the new footing and show your calculations
4.Describe what design changes could be made to address this including design change measurements. Use the Geotechnical report to confirm.
5. Describe how these changes would be certified and implemented to ensure compliance with NCC/BCA requirements including Industry Professionals and their role in the process.
Step by Step Solution
3.45 Rating (148 Votes )
There are 3 Steps involved in it
Step: 1
To assess the structural adequacy of the buildings column pad footing at Grid D2 follow these steps 1 Calculate the Total Load on the Column Pad Footi...Get Instant Access to Expert-Tailored Solutions
See step-by-step solutions with expert insights and AI powered tools for academic success
Step: 2
Step: 3
Ace Your Homework with AI
Get the answers you need in no time with our AI-driven, step-by-step assistance
Get Started