Question
Variance Analysis, Revision of Standards, Journal Entries The Lubbock plant of Morril's Small Motor Division produces a major subassembly for a 6.0 horsepower motor for
Variance Analysis, Revision of Standards, Journal Entries
The Lubbock plant of Morril's Small Motor Division produces a major subassembly for a 6.0 horsepower motor for lawn mowers. The plant uses a standard costing system for production costing and control. The standard cost sheet for the subassembly follows:
Direct materials (6.0 lbs. @ $5) | $30.00 |
Direct labor (1.6 hrs. @ $12) | 19.20 |
During the year, the Lubbock plant had the following actual production activity:
- Production of subassemblies totaled 50,000 units.
- A total of 260,000 pounds of raw materials was purchased at $4.70 per pound.
- There were 60,000 pounds of raw materials in beginning inventory (carried at $5 per lb.). There was no ending inventory.
- The company used 82,000 direct labor hours at a total cost of $1,066,000.
The Lubbock plant's practical activity is 60,000 units per year. Standard overhead rates are computed based on practical activity measured in standard direct labor hours.
Required:
1. Conceptual Connection: Compute the materials price and usage variances.
Materials price variance | $ | |
Materials usage variance | $ |
Of the two materials variances, which is viewed as the most controllable?
2. Conceptual Connection: Compute the labor rate and efficiency variances.
Labor rate variance | $ | |
Labor efficiency variance | $ |
3. Conceptual Connection: Assume that the purchasing agent for the small motors plant purchased a lower-quality raw material from a new supplier. Would you recommend that the plant continue to use this cheaper raw material?
4. Prepare all possible journal entries. For a compound transaction, if an amount box does not require an entry, leave it blank or enter "0".
Journal | |||
Account & Explanation | Debit | Credit | |
Record materials price variance | |||
Record materials usage variance | |||
Record payroll | |||
Transfer of Material usage variances and labor variances. | |||
Transfer materials price variance |
Step by Step Solution
There are 3 Steps involved in it
Step: 1
Get Instant Access to Expert-Tailored Solutions
See step-by-step solutions with expert insights and AI powered tools for academic success
Step: 2
Step: 3
Ace Your Homework with AI
Get the answers you need in no time with our AI-driven, step-by-step assistance
Get Started