Vintage Fundos de fer les and the production and the world and the compare locate it was to promotor de worse, whether the dis 14. The changing to an activity in their new Canadiabad A. DOW Total 16.300 345 310 Engineeringute $10.000 400 670 159 Maintenance out BAS 2.275 3.140 423 The cost oliy teleronering uit wat beweerdes) OA 20. peranging hour OG 514 per engineering to 30.00 per engineering our OD 57.73 per enging Vintage Fun reproduces old-fashioned style roller skates and skateboards. The annual production and sales of roller skates is 900 units, while 1,730 skateboards are produced and sold. The company has traditionally used direct labor hours to allocate its overhead to products, Roller skates require 3.5 direct labor hours per unit, while skateboards require 3.25 direct labor hours per unit. The total estimated overhead for the period is $114,400. The company is looking at the possibility of changing to an activity - based costing system for its products. If the company used an activity-based costing system, it would have the following three activity cost pools: Expected activity Estimated overhead Activity cost pool cost Roller skates Skateboards Total Setup costs $6,350 345 655 Engineering costs $16,600 480 670 1,150 Maintenance costs $91,450 2,275 2,148 4,423 310 A. $20.68 per engineering hour. B. $14.43 per engineering hour. OC. $9.69 per engineering hour. D. $773 per engineering hour. This Question: 1 pt 6 of 20 (7 complete) This Quiz: 20 pts possi Is you units, wnile 1,730 Skateboards are produced and sold. I ne company nas traditionally used airect lapor nours to allocate its overhead to products. Roller skates require 3.5 direct labor hours per unit, while skateboards require 3.25 direct labor hours per unit. The total estimated overhead for the period is $114,400. The company is looking at the possibility of changing to an activity - based costing system for its products. If the company used an activity - based costing system, it would have the following three activity cost pools: Expected activity Estimated overhead Activity cost pool cost Roller skates Skateboards Total Setup costs $6,350 310 Engineering costs $16,600 480 670 1,150 Maintenance costs $91,450 2,275 2,148 4,423 The cost pool activity rate for Engineering Costs would be closest to (Round all answers to two decimal places.) 345 655 A. $20.68 per engineering hour. B. $14.43 per engineering hour. OC. $9.69 per engineering hour. D. $7.73 per engineering hour