Answered step by step
Verified Expert Solution
Link Copied!

Question

1 Approved Answer

VOMP 3002 Commissioning and Qualification of Equipment and systems Session 2 Topic 1 a.)In the example of a newly installed gas boiler heating system in

VOMP 3002 Commissioning and Qualification of Equipment and systems

Session 2 Topic 1

a.)In the example of a newly installed gas boiler heating system in your home, in your opinion what is the purpose of a testing verification protocol for it?

What will it prove about the system itself?

b.)Define the objective(s) behind a typical testing verification (qualification) protocol

c.)What should be contained within the 'system description'

d.)How could you determine the scope of a testing verification (qualification) protocol?

Session 2 Topic2

A)What part(s) of an equipment system could negatively impact on product quality when processing any ingestible product?

B)Is our Hot Detergent and Hot PUW Generation and Distribution Skid System 'Direct-Impact'? Why?

C.) Is our Hot Detergent and Hot PUW Generation and Distribution Skid System 'No-Impact'? Why?

D. Is our Hot Detergent and Hot PUW Generation and Distribution Skid System 'Indirect-Impact'? Why?

Is our Hot Detergent and Hot PUW Generation and Distribution Skid System 'Direct-Impact'? Why?

Session 2 Topic 3

When performing a test on an equipment system what in your opinion would be 'acceptable test evidence' in order to prove the system is fit for intended

Why is it important to define roles and responsibilities of people involved in a testing event?

Why is it important to define roles and responsibilities of people involved in a testing event?

Why do you think we need documentation handling standards on a project?

What in your opinion is the difference between a 'deviation' and a 'change'?

Session 2 Topic 4

How would you regulate and control the flow of water when filling a bath?

How many different categories of valves can you think of?

What type of valves would be good for regulating flow precisely?

What do you think the difference is between a pressure regulating valve and a pressure safety valve?

Session 2 Topic 5

1.Thinking about for example transferring a process fluid in a pipe between two process vessels what major information would you require if you were to do installation verification testing on the pipe?

2.a. List the main service categories of piping on the P&ID

2.b. Describe a typical numbering system for identifying piping on a P&ID?

2.c. Why do you think some pipes insulated whereas and others are not?

Session 2 Topic6

1.What information do you think should be contained within a plan for a verification testing strategy?

2.a. At this early stage and after having looked at the traceability matrix for the first time; what primarily with be involved in installation type tests?

2.b. What primarily with be involved in operational/functional type tests?

2.c. What is the difference do you think between a validation master plan

Step by Step Solution

There are 3 Steps involved in it

Step: 1

blur-text-image

Get Instant Access with AI-Powered Solutions

See step-by-step solutions with expert insights and AI powered tools for academic success

Step: 2

blur-text-image

Step: 3

blur-text-image

Ace Your Homework with AI

Get the answers you need in no time with our AI-driven, step-by-step assistance

Get Started

Recommended Textbook for

Entrepreneurship

Authors: Andrew Zacharakis, William D Bygrave

5th Edition

1119563097, 9781119563099

Students also viewed these Mathematics questions