Question
Washie manufactures two types of products for washing vehicles: the washing mitt, and the polishing cloth. Up to this point, Washie has been utilizing traditional
Washie manufactures two types of products for washing vehicles: the washing mitt, and the polishing cloth. Up to this point, Washie has been utilizing traditional costing with one plant-wide overhead rate using machine hours as the allocation base. Management is considering ABC and has gathered information on the potential activity areas to be used.
Activity | Activity Measure | Estimated Manufacturing Overhead Cost |
Design | Design hours | $12,000 |
Setups | Number of set-ups | $40,000 |
Materials Handling | Meters of fabric | $30,000 |
Production | Machine Hours | $250,000 |
During the year, the company sold 100,000 washing mitts and 50,000 polishing cloths. Direct costs are $8.00 for washing mitts and $2.00 for polishing costs. The company has determined the expected activity for each of the product lines to be:
Activity Measure | Washing Mitt | Polishing Cloth |
# of design hours | 50 | 5 |
# of setups | 30 | 20 |
# of meters of fabric | 4,000 | 1,000 |
# of machine hours | 40,000 | 10,000 |
Compute the predetermined overhead rate using machine hours as the basis for allocating overhead costs to products.
| |||
| |||
| |||
|
Step by Step Solution
3.31 Rating (148 Votes )
There are 3 Steps involved in it
Step: 1
OPTION 2 664 Calculations Predetermined Overhead rate Total O...Get Instant Access to Expert-Tailored Solutions
See step-by-step solutions with expert insights and AI powered tools for academic success
Step: 2
Step: 3
Ace Your Homework with AI
Get the answers you need in no time with our AI-driven, step-by-step assistance
Get Started