Answered step by step
Verified Expert Solution
Link Copied!

Question

1 Approved Answer

Waterways Problem 04 b-c Direct labor or machine hours may not be the appropriate cost driver for overhead in all areas of manufacturing due to

Waterways Problem 04 b-c

Direct labor or machine hours may not be the appropriate cost driver for overhead in all areas of manufacturing due to the complexities of many manufacturing processes. Many companies use activity-based costing (ABC) which uses multiple drivers (items that consume resources) rather than just one driver to apply overhead to their activities. With ABC, a company can use a cost driver that has a direct cause/effect relationship in its applied overhead costs. Waterways looked into ABC as a method of costing because of the variety of items it produces and the many different activities in which it is involved. The activities listed below area sample of possible cost pools for Waterways.
Assembling Payroll
Billing Plant supervision
Digging trenches Product design
Janitorial Purchasing materials
Machine maintenance Selling
Machine setups Testing
Molding Welding
Packaging
Using the following information, determine the overhead rates and the actual cost assigned for each of the activity cost pools in a possible ABC system for Waterways. (Round answers to 2 decimal places, e.g. 12.25.)
WATERWAYS CORPORATION
Activity Cost Pools Cost Drivers Estimated Overhead Expected Use of Cost Drivers per Activity Actual Use of Drivers
Irrigation installation Labor cost $1,857,000 12,380 12,364
Machining (all machine use) Machine hours 1,691,400 33,828,000 33,829,000
Customer orders Number of orders 34,580 2,660 2,625
Shipping none (direct) N/A N/A traced directly
Design Cost per design 888 8 7
Selling Number of sales calls 380,800 23,800 24,010
WATERWAYS CORPORATION
Activity Cost Pools Activity- Based Overhead Rates Actual Cost Assigned
Irrigation installation $

$

Machining (all machine use)

Customer orders

Design

Selling

LINK TO TEXT

LINK TO TEXT

How would you classify each of the following activities by levelunit level, batch level, product level, or facility level?
Testing of products (if all items are tested)

FacilityBatchUnitProduct

Testing of products (if all items are not tested)

ProductUnitBatchFacility

Designing new products

BatchFacilityProductUnit

Packaging

FacilityBatchProductUnit

Molding

UnitProductFacilityBatch

Assembling

UnitBatchProductFacility

Depreciation

ProductBatchFacilityUnit

Machine maintenance

ProductUnitFacilityBatch

Advertising

ProductUnitBatchFacility

Equipment setups

FacilityUnitBatchProduct

Electricity required to run equipment

ProductBatchFacilityUnit

Requisitioning materials

FacilityProductUnitBatch

Step by Step Solution

There are 3 Steps involved in it

Step: 1

blur-text-image

Get Instant Access to Expert-Tailored Solutions

See step-by-step solutions with expert insights and AI powered tools for academic success

Step: 2

blur-text-image

Step: 3

blur-text-image

Ace Your Homework with AI

Get the answers you need in no time with our AI-driven, step-by-step assistance

Get Started

Recommended Textbook for

More Books

Students also viewed these Accounting questions

Question

5. Understand how cultural values influence conflict behavior.

Answered: 1 week ago