We have new equipment with this learning curve and a material cost of $ 1.54 per unit. Currently the material loses 5% during the production
We have new equipment with this learning curve and a material cost of $ 1.54 per unit.
Currently the material loses 5% during the production process.
If the capacity is 30,633 units per week, how much would it cost to learn the material?