Answered step by step
Verified Expert Solution
Question
1 Approved Answer
Weighted Average Method, Physical Flow, Equivalent Units, Unit Costs, Cost Assignment, ABC Swasey Fabrication, Inc., manufactures frames for bicycles. Each frame passes through three processes:
Weighted Average Method, Physical Flow, Equivalent Units, Unit Costs, Cost Assignment, ABC Swasey Fabrication, Inc., manufactures frames for bicycles. Each frame passes through three processes: Cutting, Welding, and Painting. In September, the Cutting Department of the Tulsa, oklahoma, plant reported the following data: a. In Cutting, all direct materials are added at the beginning of the process. b. Beginning work in process consisted of 40,500 units, 20 percent complete with respect to direct labor and overhead. Costs in beginning inventory included direct materials, $1,215,000; direct labor, $222,600; and applied overhead, $150,000. assigned using the following information: Activity Inspection Maintenance c. Costs added to production during the month were direct materials, $2,565,000; direct labor, $3,471,150. Overhead was Rate $150 per inspection hour $750 per maintenance hour $300 per receiving order Actual Driver Usage 4,000 inspection hours 1,600 maintenance hours 2,000 receiving orders Receiving d. At the end of the month, 121,500 units were transferred out to Welding, leaving 13,500 units in ending work in process, or 25 percent complete. Required: 1. Prepare a physical flow schedule
Step by Step Solution
There are 3 Steps involved in it
Step: 1
Get Instant Access to Expert-Tailored Solutions
See step-by-step solutions with expert insights and AI powered tools for academic success
Step: 2
Step: 3
Ace Your Homework with AI
Get the answers you need in no time with our AI-driven, step-by-step assistance
Get Started