Question
1 Approved Answer
What is the relationship between Technical Performance Measures (TPM) and risk items? When do TPMs trigger risk items for proactive risk mitigation? Describe the contents
- What is the relationship between Technical Performance Measures (TPM) and risk items?
- When do TPMs trigger risk items for proactive risk mitigation?
- Describe the contents of the image below (Figure 34.17 from the textbook) Pick a component that has been identified as an FMEA risk item and describe the technical process for reducing its risk.
A Operator Interactions Time or Operating Cycles Operating Environment Environmental Conditions Threats Hostile Natural Induced Operational Scenarios Unique Identifier linked to Risk Assessment impact Levels of Abstraction identified characterized by by impact System Probability or Likelihood of Occurrence create Failure Mode Consequences manifests Product of Failure as Failure Effect(s) characterized impact Subsystem by characterized by Level of Risk resolved by Assembly initiates Severity Classification Mitigating Actions Subassembly Corrective Actions Part dictate SOPP Changes A Design Modifications
Step by Step Solution
There are 3 Steps involved in it
Step: 1
Get Instant Access to Expert-Tailored Solutions
See step-by-step solutions with expert insights and AI powered tools for academic success
Step: 2
Step: 3
Ace Your Homework with AI
Get the answers you need in no time with our AI-driven, step-by-step assistance
Get Started