Which is not true about the PDM for the project? Select the most appropriate one. a . The project duration is 9 . b .
Which is not true about the PDM for the project? Select the most appropriate one.
a The project duration is
b The total float of C is
c The free float of B is
d None of the above is true.Figure Problem &