Which of the following is False regarding the industrial engineering method for cost estimation? a. historical information is required b. historical information is not required
Which of the following is False regarding the industrial engineering method for cost estimation? a. historical information is required b. historical information is not required c. time and motion studies can be used to analyze the time required to perform tasks. d. this method is detailed and can be time-consuming and costly
Step by Step Solution
There are 3 Steps involved in it
Step: 1