Which release constraint model is considered to be best aligned with Agile principles?A) Fixed-scope B) Fixed-date C)
Question:
- Which release constraint model is considered to be best aligned with Agile principles?A) Fixed-scope B) Fixed-date C) Fixed-scope-and-date D) Fixed-everything
- During which envisioning technique does a Scrum team (create) a rough prototype of the product packaging? A) Elevator pitch B) Six-word story C) Magazine review D) Product vision box
- Which of the following is an output of product planning? A) Release plan B) Strategic filter C) Product vision D) Sprint backlog
- Envisioning is a planning technique that takes place in which stage of planning? A) Product planning B) Release planning C) Sprint planning D) Daily planning
- How are feature requirements defined in a Scrum project environment?
A) Feature requirements are the desired characteristics that a product must have, or functions that it must be able to perform, once the product is completed.
B) Feature requirements are the characteristics of a team that must be in place before a project begins.
C) Feature requirements are the description of the environment that the development team needs in order to be able to (create) a product.
D) Feature requirements are the functions that a Scrum Master must be able to perform in order for the product to be completed.
6.) What is progressive refinement?
A) Detailing and developing feature requirements over time.
B) Accepting a lower quality version of features, knowing they can be refined.
C) The concept that Scrum teams get better as they work together longer
D) Continually improving the Scrum team processes.
7) Which of the following is the correct user story structure?
A) As a [User Role], I want to [Benefit], so that I can [Goal].
B) Given that [Premise], when [Event], then [Outcome].
C) As a [Scrum Team Role], I want to inspect [Feature], so that I can adapt [Product Backlog Item].
D) As a [User Role], I want to [Goal], so that I can [Benefit].
8) What does acceptance criteria measure in an Agile project?
A) That a user story is complete
B) That the project is done
C) That the project owner is satisfied
D) That users accept the product