Question
Williams Garden Sheds Williams Garden Sheds (WGS) manufactures sheds that homeowners use in their yards to store yard implements and gardening supplies. There are 12
Williams Garden Sheds
Williams Garden Sheds (WGS) manufactures sheds that homeowners use in their yards to store yard implements and gardening supplies. There are 12 shed versions. However, all cost the same to manufacture. Sheds are sold for $5,800 per unit.
The sheds are made in three departments: warehouse, factory, and assembly. Shed manufacture begins with a worker withdrawing the supplies needed for the shed from the warehouse and conveying the shed components to the factory department. There, the lumber needed to make the shed is rendered into the pieces needed to assemble the shed. Finally, the individual shed pieces are conveyed to the assembly department where they are assembled into the completed shed. The buyer arranges (at their own cost) for transporting the shed from WGS to its destination.
All costs except materials costs are treated as fixed manufacturing overhead, while materials are treated as direct, variable costs. The following is a summary of the budgeted departmental fixed manufacturing overhead cost (also called overhead costs). Note the departmental capacity and cost driver for each department.
Overhead Item | Warehouse | Factory | Assembly |
Depreciation | 40,000 | 100,000 | 50,000 |
Supervisor | 65,000 | 80,000 | 60,000 |
Labour | 80,000 | 130,000 | 210,000 |
Heat, light, cooling | 20,000 | 20,000 | 20,000 |
Property tax | 5,000 | 10,000 | 10,000 |
Total | 210,000 | 340,000 | 350,000 |
Cost Driver | Materials cost | Machine hours | Labour hours |
Practical Capacity | 840,000 | 5,000 | 7,0000 |
WGS has a budget allowance that expects workers in the warehouse to handle $300 of the direct materials per labour hour. Each machine hour requires an operator so that labour hours in the factory equal machine hours.
The resources required per shed are $2,700 in materials cost from the warehouse, 14 machine hours in the factory and 22 labour hours in assembly.
Show calculations.
if WGS increases the selling price per shed by $300 what will be the lowest level of resulting sales that would make this price increase desirable, compared with the current production plan?
Step by Step Solution
There are 3 Steps involved in it
Step: 1
Get Instant Access to Expert-Tailored Solutions
See step-by-step solutions with expert insights and AI powered tools for academic success
Step: 2
Step: 3
Ace Your Homework with AI
Get the answers you need in no time with our AI-driven, step-by-step assistance
Get Started