Answered step by step
Verified Expert Solution
Link Copied!

Question

1 Approved Answer

Wolseleys dilemma of Traditional Costing versus Activity Based Costing Wolseley Manufacturing Corporation manufactures various electronics products and follows a traditional (job-order) costing system in which

Wolseleys dilemma of Traditional Costing versus Activity Based Costing Wolseley Manufacturing Corporation manufactures various electronics products and follows a traditional (job-order) costing system in which it applies manufacturing overhead to its products using a predetermined overhead rate based on direct labour-hours (DLHs). The company has two products, C18R and G19R, about which it has provided the following data: C18R G19R Direct materials per unit $10.20 $50.50 Direct labour per unit $8.40 $25.20 Direct labour hours per unit 0.40 1.20 Annual production 30,000 10,000 The company's estimated total manufacturing overhead for the year is $1,464,480 and the company's estimated total direct labour-hours for the year is 24,000. The company is considering using a variation of activity-based costing to determine its unit product costs for external reports. Data for this proposed activity-based costing system appear below: Activities and Activity Measures Estimated Overhead Cost Supporting direct labour (DLHs) $552,000 Setting up machines (setups) 132,480 Parts administration (part types) 780,000 Total $1,464,480 Activities C18R G19R Total Supporting direct labour 12,000 12,000 24,000 Setting up machines 864 240 1,104 Part administration 600 960 1,560 Mike, who is the controller of the Company, is currently overseeing the project to switch from traditional costing to Activity-Based costing. He is in a meeting with the Cost Accountant of the company. The Controller goes over the data and makes the following comments: Activity-Based Costing is a revelation in the modern-day world of manufacturing Industry. If we are correctly able to categorize the various nature of work into essential levels, then we can dramatically trace the precise nature of the overheard activity. Jacob, the Cost Accountant, quips, how can we classify those levels of activities? Do we have some mechanism to identify them? Mike responds, Yes! We do. Jacob then laments the pitfalls of the job order costing system, The production report will be out soon and usually, the allocation bases (including overhead allocations in job-order costing systems) are not entirely accurate. Mike, with a pause, That is exactly why we may eventually need to switch to the Activity-Based costing though it is comparatively difficult to implement with the cost and operations limitations involved in it. Jacob adds, Another consideration to evaluate is the relationship between the cost of maximum (budgeted) capacity and idle capacity, since the company is likely to operate at maximum capacities during the time of peak demand. Moreover, our long-term goals of stable cost predictions and waste minimizations should also be kept in mind. Alright! Let us calculate and analyze the quantitative and qualitative aspects of the data and other factors we have discussed in the meeting today and prepare the preliminary report for the CEO by this weekend. Mike with the final comments! Submission Instructions a. Determine the manufacturing overhead cost per unit of each of the company's two products under the traditional costing system. b. Determine the manufacturing overhead cost per unit of each of the company's two products under activity-based costing system. c. Compare the results in part a and b under both costing systems and specify the differences in both systems. d. What is the significance of the Activity Costing System that Mike is referring to? e. How is ABC system different from traditional costing system? f. The use of which activity level, budgeted (same as expected) or maximum capacity, is consistent with ABC? Explain. g. How might the use of ABC based on maximum capacity activity level enhance a firm's ability to compete on price? Explain. h. If you were to recommend one of the costing systems for Wolseley Inc., which one would you pick and why? Evaluation Activities/Competencies Demonstrated 1 Identification and Analysis of Issues (80%) a. Compute the predetermined overhead rate / 15 b. Determine the unit overhead cost of each product under traditional costing /15 c. Determine the unit overhead cost of each product under ABC system /10 d. Significance of ABC costing /10 e. Difference between the two costing systems /10 f. Budgeted vs Idle Capacity /10 g. Competition on Price /10 2. Recommendation (20%) h. Advise to Wolseley Inc. /20 Total /100

Step by Step Solution

There are 3 Steps involved in it

Step: 1

blur-text-image

Get Instant Access to Expert-Tailored Solutions

See step-by-step solutions with expert insights and AI powered tools for academic success

Step: 2

blur-text-image

Step: 3

blur-text-image

Ace Your Homework with AI

Get the answers you need in no time with our AI-driven, step-by-step assistance

Get Started

Recommended Textbook for

International Standards On Auditing An Institutional Driver For Audit Quality

Authors: Dries Schockaert

1st Edition

2874035467, 978-2874035463

More Books

Students also viewed these Accounting questions