Woodland Industries manufactures and selis custom-made windows, its job costing system was designed using an activity-based costing approach. Direct materials and direct labor costs are accumulated sepsrately, along with information concerning three monufacturing overhead cost divers (activities). Assume that the direct labor rate is $18 per hour and that there were no beginning Inventories, The following information was avaliable for 2022, based on an expected production level of 50,000 units for the year, which will require 200.000 direct labor hours: The following production, costs, and activities occurred during the month of July: Required: a. Caiculote the total mamulacturing costs and the cost per unit of the windows produced during the month of July fusing the actwity. based costing approoch). Note: Round "Cost per unit produced" to 2 decimal places. Do not round intermediate calculations. b. Assume insteod that Woodiand industries applies manufacturing overhead on a direct labor hours basis father than using the octivity based costing syitem previously described). Calculate the total manufacturing cost and the cost per unit of the windows produced during the month of July. (Hint. You wal need to calculote the predetermined overhead application rate using the total budgeted overhesd costs for 2022) Note: Round "Cost per unit produced" to 2 decimal places. Do not round iritermediate calculations. c. Which approsch do you think provides better informetion for manufactuing managers? Required: a. Caicutate the tokal manufacturing costs and the cost per unit of the windows produced during the month of July fusing the actevity based costing approach). Note: Round "Cost per unit produced" to 2 decimal places. Do not round intermediate calculations. b. Assume insteod that Woodfand industries applies manufacturing overhead on a direct labor hours basis irather than using the activity-based costing system previously described. Calculate the total manufacturing cost and the cost per unit of the windows produced during the month of July. (Hint You will need to calculate the predetermingd overhead application rate using the total budgeted overthead costs for 2022) Note: Round "Cost per unit peoduced" to 2 decimal places. Do not round intermediate calculations. e. Which approach do you think provides betier information for manufacturing managers