Question
XYZ-Budget data six months to 30 June 2004 Product Alpha Product Sigma Material Cost per Product Unit $60 $45 Production line A- machine hours per
XYZ-Budget data six months to 30 June 2004
Product Alpha Product Sigma
Material Cost per Product Unit $60 $45
Production line A- machine hours per unit 0.8 0.5
Production batch size units 100 200
Total production units Use your Arid No. Last 4 Digits for Alpha and 1.75 time your Arid No. for Sigma
Components per product unit quantity 20 12
Number of customers 5 10
Number of production line set- ups 15 25
Production line A-maintenance hours 300 150
XYZ makes and sells a range of products. Management has carried out an analysis of the total cost of production. The analysis has identified that the factory is organized in order to permit the operation of three production lines A, B and C. Each production line facilities the production of two or more products. Production line A is only used for the production of products Alpha and Sigma. The products are manufactured in batches JIT basis in order to fulfill orders from customers. Only one product can be manufactured on the production line at any one time. Materials are purchased and received on a JIT basis. Additional information is available for production line A as follows:
i. Production line machine costs including labor, power, etc., vary in proportion to machine hours.
ii. Costs incurred for production scheduling, WIP movement, purchasing and receipts of materials are assumed to be incurred in proportion to the number of batches of product which are manufactured. Machine set-up costs vary in proportion to the number of set-ups required and are linked to a batch throughput system.
iii. Cost for materials scheduling systems and design/testing routine are assumed to be incurred by each product in proportion to the total quantity of components purchased and total number of types of components designed/tested for products Alpha and Sigma are 12 and 8 respectively.
iv. Product line development cost is identified with changes in product design and production method. At present such cost for production line A are apportioned 80%:20% to product Alpha and Sigma respectively. Production line maintenance costs are assumed to vary in production to the maintenance hours required for each product.
Required: (1) prepare an activity based budget for production line X for the six month period to 30 June 2004 analyzed into sub-sets for activities which are product unit based, batch based, product sustaining, production line sustaining.
The budget should show: (a) Total cost of each activity sub-sets grouped to reflect the differing operational levels at which each sub-sets is incurred/controlled. (b) Average cost per unit for each of products A and B analyzed by activity sub-set.
Step by Step Solution
3.46 Rating (153 Votes )
There are 3 Steps involved in it
Step: 1
ANSWER 1 Activity Based Budget for Production Line A Product Unit Based Costs Material Cost per Unit ...Get Instant Access to Expert-Tailored Solutions
See step-by-step solutions with expert insights and AI powered tools for academic success
Step: 2
Step: 3
Ace Your Homework with AI
Get the answers you need in no time with our AI-driven, step-by-step assistance
Get Started