Answered step by step
Verified Expert Solution
Link Copied!

Question

1 Approved Answer

You are estimating the construction of a fire partition that is 10 tall and 30 long. Studs are placed 16 on center, there is a

  1. You are estimating the construction of a fire partition that is 10 tall and 30 long. Studs are placed 16 on center, there is a single plate top and bottom, and both sides are covered with gypsum wallboard. Assume that you will require 2 roll2 of finishing tape and one 5 pound box of 2 drywall screws per 8 length of wall and you will need one 675 lb bucket of joint compound.

Labor costs will be estimated as follows:

  • Framing labor is 2 crew hours per 10 length of wall.
  • Finishing labor is 4 crew hours per 10 length of wall.

The labor crew is composed of 2 laborers each making a base salary of $15.45 per hour. Their FICA is 6.8% of their wages, Medicare tax is 1.45% of the wages, unemployment insurance is 5% of their annual salary, and other overhead (retirement, insurance, etc.) is 34% of their salary. They also have a uniform allotment of $500 per year.

  1. Assuming a 40 hour work week for 50 weeks per year, what is the loaded labor cost per hour for the two man crew.
  2. Using online sources, provide an in depth estimate of direct cost for the work to be completed. Make sure your estimate includes the appropriate columns.
  3. Using the above estimate, add 10% for overhead expenses and 7% for profit to determine the amount of the final bid you will provide to the client.

Step by Step Solution

There are 3 Steps involved in it

Step: 1

blur-text-image

Get Instant Access to Expert-Tailored Solutions

See step-by-step solutions with expert insights and AI powered tools for academic success

Step: 2

blur-text-image

Step: 3

blur-text-image

Ace Your Homework with AI

Get the answers you need in no time with our AI-driven, step-by-step assistance

Get Started

Students also viewed these Accounting questions