Question
You are required to design the SCADA system for a coffee production plant. A simplified process flow diagram is shown in the figure on the
You are required to design the SCADA system for a coffee production plant. A simplified process flow diagram is shown in the figure on the next page.
For this process the requirements are as follows:
Water reserve tank (T001): Level is monitored
Water batch tank (T002): Level and temperature are monitored
Milk batch tank (T003): Level and temperature are monitored
Sugar bin (T004): Level is monitored. Sugar is in solid form.
Coffee bin (T005): Level is monitored. Coffee is in solid form.
Diesel storage tank (T006): Level, temperature, and pressure are monitored
Steam drum (T007): Level, temperature, and pressure are monitored
Pasteurizer/mixer: Temperature, level, and motor status (On/Off) are monitored
Bottling storage tank (T010): Level and temperature are monitored
On all lines 1-10 suitable flowmeters are installed, and the flow of solids or fluids is monitored.
All valves can be controlled in manual and/or auto manner.
The Pasteurizer/mixer motor could be turned on/off in manual and/or auto manner.
The operator should be able to shutoff the boiler and the whole process.
The hot water/steam supply valve (V008) is manipulated by a temperature controller receiving the temperature of the liquid in the pasteurizer/mixer. The operator should be able to modify the setpoint of the controller.
Question 1: (5 marks)
Would you use a SCADA/PLC or a DCS system for this project? Justify your choice.
Question 2: (10 marks)
Evaluate the data communication needs including the network architecture, the protocols, and the required equipment. Justify the choice and provide a diagram showing the networking architecture.
Question 3: (35 marks)
Use FactoryTalk View Studio to create the main HMI screen. When creating the HMI screen connect at least one object to an existing tag to test the data exchange. You can use systems tags such as seconds to get a variable that constantly changes (this could be useful to simulate a filling tank for example).
Provide a screenshot of the main display. (20 marks)
Provide a screenshot showing the connection of one object (such as a Numeric display) to a tag. (5 marks)
Provide a screenshot showing FactoryTalk View SE Client display running. (5 marks)
Propose a list of alarms for this process. (5 marks)
Sugar bin (ppwder) T004 v004 V005 Milk batch tank TDO2 ToO3 Bottling storage tank Diesel storage tank T006Step by Step Solution
There are 3 Steps involved in it
Step: 1
Get Instant Access to Expert-Tailored Solutions
See step-by-step solutions with expert insights and AI powered tools for academic success
Step: 2
Step: 3