Answered step by step
Verified Expert Solution
Link Copied!

Question

1 Approved Answer

You are the Quality Manager for Widgets, Inc. You have just won a contract to produce a specialized widget that the customer requires a very

You are the Quality Manager for Widgets, Inc. You have just won a contract to produce a specialized widget that the customer requires a very tight specification limit. This widget is to be 5.50 in length, plus or minus .50. This gives the total specification limit of 5.00 to 6.00. You have set up the production line to produce a test run of the widgets (Data Set 1). The sample size consists of a total of 20 samples per run, with a total of four (4) runs. A total of 80 samples will be used to determine if the process is capable of producing the widgets within specification. Due to the specifications of the customer, and the setup of the manufacturing processes, the systematic random sampling technique was used to ensure that samples from each run were collected at the same point in time on different days. This provides the basis for the X-bar chart to group the sample from each run into logical subgroups. Perform the following for: Data Set 1 Date Set 2 X-Bar Charts Requirements Calculate the subgroup mean for each numbered sample Calculate the grand mean and standard deviation of the subgroup samples Calculate the UCL and LCL of the grouped samples Create the X-bar chart Provide detailed analysis of the X-bar chart IM Chart Requirements To ensure that the process in actually producing individual widgets within specification limits, you have decided to use an Individual Measurement chart that will plot each of the 80 samples against a calculated UCL and LCL, as well as plotting the data against the customer specification limits. Stack the sample data (place the run data into a single column. Run 1 first, Run 2 second, etc) Using the Data Analysis Toolpak, create the Descriptive Statistics for the stacked data Using the Descriptive Statistics output, calculate the UCL and LCL Create the IM chart using the calculated UCL and LCL Recopy the stacked data, and enter the customer specification limits Create the IM chart of the sample data against the customer specifications Provide a detailed analysis of both IM charts Answer Questions for Data Sets Answer the questions on the Questions DS 1 or DS 2 tab on the spreadsheet, and follow the instructions

Step by Step Solution

There are 3 Steps involved in it

Step: 1

blur-text-image

Get Instant Access to Expert-Tailored Solutions

See step-by-step solutions with expert insights and AI powered tools for academic success

Step: 2

blur-text-image_2

Step: 3

blur-text-image_3

Ace Your Homework with AI

Get the answers you need in no time with our AI-driven, step-by-step assistance

Get Started

Recommended Textbook for

Project Management A Systems Approach to Planning Scheduling and Controlling

Authors: Harold Kerzner

11th edition

1118022270, 978-1118415856, 111841585X, 978-1118022276

More Books

Students also viewed these General Management questions

Question

H.W(2) Q: Show that ' = and p = are odd Under parity p' p

Answered: 1 week ago

Question

Hello using gririth third edition chapter 6 please help

Answered: 1 week ago

Question

Hello using grifth edition three chapter 6

Answered: 1 week ago

Question

Py:- verify that: (s) - 0 RGJ R (2) = O -S S 1 es

Answered: 1 week ago