Question
You are working on a concrete mix design that requires eachcubic yard of concrete to have 0.45 watercement ratio, 1963lb/yd 3 of dry gravel, 4%
You are working on a concrete mix design that requires eachcubic yard of concrete to have 0.45 water–cement ratio, 1963lb/yd3 of dry gravel, 4% air content, and 565lb/yd3 of cement. The available gravel has aspecific gravity of Ggravel = 2.7, amoisture content of 1.6%, and absorption of 2.4%. The availablesand has a specific gravityof Gsand = 2.5, a moisture content of4.8%, and absorption of 1.5%. For each cubic meter of concreteneeded on the job, calculate the mass of cement, moist gravel,moist sand, and water that should be added to the batch.
Step by Step Solution
There are 3 Steps involved in it
Step: 1
To calculate the mass of cement moist gravel moist sand and water for each cubic yard of concrete we ...Get Instant Access to Expert-Tailored Solutions
See step-by-step solutions with expert insights and AI powered tools for academic success
Step: 2
Step: 3
Document Format ( 2 attachments)
663eaa3d971db_953480.pdf
180 KBs PDF File
663eaa3d971db_953480.docx
120 KBs Word File
Ace Your Homework with AI
Get the answers you need in no time with our AI-driven, step-by-step assistance
Get Started