You are working on a concrete mix design that requires eachcubic yard of concrete to have 0.45 watercement ratio, 1963lb/yd 3 of dry gravel, 4%

You are working on a concrete mix design that requires eachcubic yard of concrete to have 0.45 water–cement ratio, 1963lb/yd3 of dry gravel, 4% air content, and 565lb/yd3 of cement. The available gravel has aspecific gravity of Ggravel = 2.7, amoisture content of 1.6%, and absorption of 2.4%. The availablesand has a specific gravityof Gsand = 2.5, a moisture content of4.8%, and absorption of 1.5%. For each cubic meter of concreteneeded on the job, calculate the mass of cement, moist gravel,moist sand, and water that should be added to the batch.


Step by Step Solution

There are 3 Steps involved in it

Step: 1

To calculate the mass of cement moist gravel moist sand and water for each cubic yard of concrete we ... blur-text-image

Get Instant Access to Expert-Tailored Solutions

See step-by-step solutions with expert insights and AI powered tools for academic success

Step: 2

blur-text-image

Step: 3

blur-text-image

Document Format ( 2 attachments)

PDF file Icon
663eaa3d971db_953480.pdf

180 KBs PDF File

Word file Icon
663eaa3d971db_953480.docx

120 KBs Word File

Ace Your Homework with AI

Get the answers you need in no time with our AI-driven, step-by-step assistance

Get Started

Recommended Textbook for

Accounting for Decision Making and Control

Authors: Jerold Zimmerman

8th edition

78025745, 978-0078025747

More Books

Students also viewed these Civil Engineering questions

Question

Solve the relation Exz:Solve therelation ne %3D

Answered: 1 week ago

Question

11. In Prob, 10,show that the first three equations are consistent.

Answered: 1 week ago

Question

4. Find the *g*-inverse of the 5 x 2 matrix *A* where

Answered: 1 week ago