Question
You have been asked to prepare a quick estimate of the construction cost for a coal-red electricity generating plant and facilities. A work breakdown structure
You have been asked to prepare a quick estimate of the construction cost for a coal-red electricity generating plant and facilities. A work breakdown structure WBS (levels one through three) is shown is Table 1. You have the following information available: 1- A coal-red generating plant twice the size e of the one you are estimating was built in 1996. The 1996 boiler (1.2) and boiler support system (1.3) cost $110 million. The cost index for boilers was 110 in 1996, it is 492 in 2019. The cost capacity factor for similar boilers and support systems is 0.9. The 600-acre site is on property you already own, but improvements (1.1.1) and roads (1.1.2) will cost $2,000 per acre, and railroads (1.1.3) will cost $3,000,000. Project integration (1.9) is projected to cost 3% of all other construction costs. 2- The security systems (1.5.4) are expected to cost $1,500 per acre, according to recent (2019) construction of similar plants. All other support facilities and equipment (1.5) elements are to be built by Viscount Engineering. Viscount Engineering has built the support facilities and equipment elements for two similar generating plants. Their experience is expected to reduce labor requirements substantially; a 90% learning curve can be assumed. Viscount built the support facilities and equipment on their rst job in 95,000 hours. For this project, Viscounts labor will be billed to you at $60 per hour. Viscount estimates that materials for the construction of the support facilities and equipment elements (except 1.5.4) will cost you $15,000,000. 3- The coal storage facility (1.4) for the coal-red generating plant built in 1996 cost $5 million. Although your plant is smaller, you require the same size e coal storage facility as the 1996 plant. You assume you can apply the cost index for similar boilers to the coal storage facility. Work Breakdown Structure Table PROJECT: Coal-Fired Electricity Generating Plant and Facilities Line No. Title WBS Element Code Work Breakdown Structure Table Project Questions Q1 (ILOs Measured: A1, A3, B1, B3, C1, C2, C3, D1, D4) [3 Marks] Represent the Project Management Lifecycle during the following: - Initiation - Planning - Execution - Monitoring and Controlling - Closure - Project Management Tools Q2 (ILOs Measured: A1, A3, B1, B3, C1, C2, C3, D1, D4) [4 Marks] Use the Work Breakdown Structure WBS given table and show the Chart View of Work Breakdown Structure for Coal-Fired Electricity Generating Plant and Facilities Q3 (ILOs Measured: A1, A3, B1, B3, C1, C2, C3, D1, D4) [4 Marks] Use the project management tools (Gantt Chart) and show the sequence of the project activities and the duration occurring in 2019. Q4 (ILOs Measured: A1, A3, B1, B3, C1, C2, C3, D1, D4) [4 Marks] What is your estimated 2019 cost for building the coal-red generating facility? Summarize your calculations in a cost estimating worksheet and state the assumptions you make.
1. 1.1 1.1.1 1.1.2 1.1.3 Coal-fired power plant Site Land improvements Roads, parking, and paved areas Railroads Boiler Furnace Pressure vessel Heat exchange system Generators Boiler support system Coal transport system Coal pulverizing system Instrumentation and control ors and distribution Coal storage facility 1.2 1.2.1 1.22 1.23 1.2.4 1.2.4 1.3 1.3.1 1.3.1 001 002 003 004 004 005 005 006 000 007 008 009 010 010 ou 012 012 013 014 015 016 010 017 017 018 019 020 021 022 022 023 024 024 025 026 026 027 028 029 030 031 Ash disposal system Stockpile reclaim reclaim system Rail car dump Support facilities and equipment Support equipment Utilities and 1.3.3 1.3.4 13 1.3.5 1.3.3 1.4 1. 1.4.1 1.4.1 1.4.2 1.4.2 1.43 1.5 1.5.1 ! 1.5.2 1.5.3 I handling equipment Hazardous waste systems and communications system Security systems Project integration Project management Environmental management Project safety Quality assurance Test, start-up, and transition management 1.5.4 1.9 1. 1.9.1 1.9.2 1.9.3 1.9.4 1.9.5Step by Step Solution
There are 3 Steps involved in it
Step: 1
Get Instant Access to Expert-Tailored Solutions
See step-by-step solutions with expert insights and AI powered tools for academic success
Step: 2
Step: 3
Ace Your Homework with AI
Get the answers you need in no time with our AI-driven, step-by-step assistance
Get Started