You have been asked to prepare a quick estimate of the construction cost for a coal-red electricity generating plant and facilities. A work breakdown structure

You have been asked to prepare a quick estimate of the construction cost for a coal-red electricity generating plant and facilities. A work breakdown structure WBS (levels one through three) is shown is Table 1. You have the following information available:image text in transcribedimage text in transcribed

1. Represent the Project Management Lifecycle during the following:

  • Initiation
  • Planning
  • Execution
  • Monitoring and Controlling
  • Closure
  • Project Management Tools
You have been asked to prepare a quick estimate of the construction cost for a coal- fired electricity generating plant and facilities. A work breakdown structure WBS (levels one through three) is shown is Table 1. You have the following information available: 1- A coal-fired generating plant twice the size e of the one you are estimating was built in 1996. The 1996 boiler (1.2) and boiler support system (1.3) cost $110 million. The cost index for boilers was 110 in 1996, it is 492 in 2019. The cost | capacity factor for similar boilers and support systems is 0.9. The 600-acre site is on property you already own, but improvements (1.1.1) and roads (1.1.2) will cost $2,000 per acre, and railroads (1.1.3) will cost $3,000,000. Project integration (1.9) is projected to cost 3% of all other construction costs. 2- The security systems (1.5.4) are expected to cost $1,500 per acre, according to recent (2019) construction of similar plants. All other support facilities and equipment (1.5) elements are to be built by Viscount Engineering. Viscount Engineering has built the support facilities and equipment elements for two similar generating plants. Their experience is expected to reduce labor requirements substantially; a 90% learning curve can be assumed. Viscount built the support facilities and equipment on their first job in 95,000 hours. For this project, Viscount's labor will be billed to you at $60 per hour. Viscount estimates that materials for the construction of the support facilities and equipment elements (except 1.5.4) will cost you $15,000,000. 3- The coal storage facility (1.4) for the coal-fired generating plant built in 1996 cost $5 million. Although your plant is smaller, you require the same size e coal storage facility as the 1996 plant. You assume you can apply the cost index for similar boilers to the coal storage facility. Represent the Project Management Lifecycle during the following: Initiation - Planning Execution Monitoring and Controlling Closure Project Management Tools

Step by Step Solution

There are 3 Steps involved in it

Step: 1

blur-text-image

Get Instant Access to Expert-Tailored Solutions

See step-by-step solutions with expert insights and AI powered tools for academic success

Step: 2

blur-text-image

Step: 3

blur-text-image

Ace Your Homework with AI

Get the answers you need in no time with our AI-driven, step-by-step assistance

Get Started

Students also viewed these Accounting questions