Answered step by step
Verified Expert Solution
Question
1 Approved Answer
You have been assigned as the project manager for a home construction project. The job is to start in 2 months from today's date and
You have been assigned as the project manager for a home construction project. The job is to start in 2 months from today's date and should be completed within 6 months from the start date. You already have the architectural and technical drawings as shown above. The financing and all the necessary building and site permits for the project have already been secured. DO NOT USE MS PROJECT FOR THIS ASSIGNMENT Draw a WBS for this project. (10 marks) Do not go beyond level 2 as shown (i.e. Level 0 - Name of the Project, Level 1, Level 2). Level 1 should completely cover (at a high level) all the things that need to be delivered in a fully constructed house including foundation works. Do not go beyond 5 items as doing so will make the rest of this assignment long and tedious. Level 2 should detail the subcomponents of Level 1 and should not go beyond 15 items in total. A diagram of components with colorful textDescription automatically generated On a separate diagram develop activity lists for all the deliverables at Level 2 as shown. (10 marks) A diagram of a productDescription automatically generated Develop a WBS dictionary showing
Step by Step Solution
There are 3 Steps involved in it
Step: 1
Get Instant Access to Expert-Tailored Solutions
See step-by-step solutions with expert insights and AI powered tools for academic success
Step: 2
Step: 3
Ace Your Homework with AI
Get the answers you need in no time with our AI-driven, step-by-step assistance
Get Started