You have been assigned by Old Dominion University to rewire Constant Hall with category 6 cable, RJ 45 outlets, and patch panels. The floor plan

You have been assigned by Old Dominion University to rewire Constant Hall with category 6 cable, RJ 45 outlets, and patch panels. The floor plan of the building, which you can assume is to scale, is linked. Each office and classroom (these are the rooms that are numbered on the floor plan) will need two data outlets. That means that two cables will need to run to each room, which will be terminated on one end with an RJ 45 outlet and in a patch panel on the other end. Use a star or extended star topology for the wiring. Pick one "equipment room" near the center of the building that will house the core switches and router for the building as well as access cables from nearby classrooms and offices. You will also need "telecomm closets" if the building is so large that any access cable will be more than 90 meters long. All of these rooms will need patch panels for terminating your cable runs. Ensure that the cable run from each of your chosen rooms to the office or classroom that is furthest away is not further than the Cat 6a spec allows (90 meters). The building is 215 feet wide. The ceilings are 10 feet tall. Use a ruler to determine the scale of the diagram and use that scale to estimate the total amount of cable that you will need.

1.A diagram of Constant Hall indicating where the equipment room and telecommunication closet(s) should be located. You may use up to 4 small rooms total for these purposes. Constant Hall was built with rooms specifically for this purpose that are shown on the floor plan without room numbers. The rooms you use must be windowless (not on the outside of the building). Your equipment room must be at least 36 square feet, but telecommunication closets can be as small as 16 square feet.

2.An estimate of the total amount of cable that will be needed. The simplest way to estimate is to average the shortest and longest cable runs to each equipment room and telecomm closet, then multiply that by the number of cables running to that room. Show the assumptions that you used about the horizontal and vertical cable runs that led you to that number (i.e., show your work).

3.A total materials budget for the cabling. Indicate the source of your price estimate.

(connect cables on picture given to you)

Step by Step Solution

There are 3 Steps involved in it

Step: 1

blur-text-image
Get Instant Access to Expert-Tailored Solutions

See step-by-step solutions with expert insights and AI powered tools for academic success

Step: 2

blur-text-image_2

Step: 3

blur-text-image_3

Ace Your Homework with AI

Get the answers you need in no time with our AI-driven, step-by-step assistance

Get Started

Recommended Textbook for

More Books

Students explore these related Databases questions