Question
You have been hired by Acme IT Solutions to design, build, and configure the network for their new spaces. The first office is located in
You have been hired by Acme IT Solutions to design, build, and configure the network for their new spaces. The first office is located in St. Mary's County (Acme's Headquarters) and occupies the 5th and 6th floor of a building. The second office is located in Calvert County and occupies the 1st and 2nd floors of the building. Acme IT Solutions is looking for the following in their network design: SSH Remote Access, VLANs, SVI, DHCP, OSPF, ACLs, NAT, PAT, Wireless Access and Switch Port Security. The specifics for each floor are provided below.
Use the following intermediary devices: 4331 Router and 2960 switch.
Requirements:
- 15 host machines must be integrated on the floorplan (includes PCs, laptops)
- 3 Mobile devices (tablets, phones)
- 2 Printers (each one on a different VLAN)
- 1 router and 1 switch (must be in the 1st floor server room. This router will be for redundancy)
- 1 Wireless router or access point
- VLANs
- Networking Security Team (on the same VLAN as IT department on the 1st floor)
- Publications and Graphic Design Department on same VLAN
- Visiting Employee Workspace (on same VLAN as Visiting Employee Workspace and President's office on 1st Floor)
- Do not allow traffic from Telnet and http (only from https) from outside the LANs
Must be able to communicate between all rooms, floors, and locations.
Step by Step Solution
3.52 Rating (159 Votes )
There are 3 Steps involved in it
Step: 1
Designing a network with the provided requirements involves several steps Below is a highlevel outline of the process Floor Plan Layout Review the flo...Get Instant Access to Expert-Tailored Solutions
See step-by-step solutions with expert insights and AI powered tools for academic success
Step: 2
Step: 3