A consultant is considering submitting detailed bids for two possible contracts. The bid for the first contract

Question:

A consultant is considering submitting detailed bids for two possible contracts. The bid for the first contract costs $100 to prepare, while that for the second contract costs $150 to prepare. If the bid for the first contract is accepted and the work is carried out, a profit of $800 will result. If the bid for the second contract is accepted and the work is carried out, a profit of $1,200 will result. Any costs of bid preparation must be subtracted from these profits. The consultant can, if he wishes, submit bids for both contracts. He does not, how- ever, have the resources to carry out both pieces of work simultaneously. If a bid is sub- mitted and accepted and the consultant is then unable to carry out the work, he counts this as a cost of $200 in lost goodwill. For the decision-making process, there are four possible states of nature: 3: Both bids rejected 32: Bid for the first contract accepted, bid for the second contract rejected s: Bid for the second contract accepted, bid for the first contract rejected Sa: Both bids accepted

(a) The consultant has four possible courses of action. What are they?

(b) Set out the payoff table for this consultant's decision-making problem.

(c) Which action is chosen by the maximin criterion?

(d) Which action is chosen by the minimax regret criterion?

Fantastic news! We've Found the answer you've been seeking!

Step by Step Answer:

Related Book For  book-img-for-question
Question Posted: