In a manufacturing process that involves a single machine, decisions must be made on whether to deliver
Question:
In a manufacturing process that involves a single machine, decisions must be made on whether to deliver the product to the customer immediately upon completion of the job or to hold the finished product in a batch with other jobs to be delivered at a later time. A computerized mathematical model for solving the batch scheduling problem was proposed in the Asian Journal of Industrial Engineering (Vol. 4, 2012). The performance of the model was graded using a variable called Value of Object Function (VOF). Simulation yielded the following data on VOF and run time (in seconds) for six software runs, each run with a different number of held batches.
a. Use simple linear regression to estimate the equation, y = βo + β1x + ∈, where y = VOF and x = number of batches.
b. Find an estimate of σ2 = V(∈), and σ = √V(∈).
c. Which of the two estimates, part b, can be practically interpreted? Give the interpretation.
Step by Step Answer:
Statistics For Engineering And The Sciences
ISBN: 9781498728850
6th Edition
Authors: William M. Mendenhall, Terry L. Sincich