Load PowerWorld Simulator case Problem 12.30. This case models a slightly modified version of the 37 bus

Question:

Load PowerWorld Simulator case Problem 12.30. This case models a slightly modified version of the 37 bus case from Example 6.13 with generator cost information, but also with two of the three lines between buses BLT69 and UIUC69 open. When the case is loaded the "Total Cost" field shows the economic dispatch solution, which results in an overload on the remaining line between buses BLT69 and UIUC69. Before solving the case, select LP OPF, OFP Buses to view the bus LMPs, noting that they are all identical. Then Select LP OPF, Primal LP to solve the case using the OPF, and again view the bus LMPs. Verify the LMP at the UIUC69 bus by manually changing the load at the bus by one MW, and then noting the change in the Total Cost field. Repeat for the DEMAR69 bus. Note, because of solution convergence tolerances the manually calculated results may not exactly match the OFP calculated bus LMPs.

Data From Example 6.13:-

image text in transcribed

Figure 6.6:-

image text in transcribed

Fantastic news! We've Found the answer you've been seeking!

Step by Step Answer:

Related Book For  book-img-for-question

Power System Analysis And Design

ISBN: 9781111425777

5th Edition

Authors: J Duncan Glover, Mulukutla S Sarma, Thomas Overbye

Question Posted: