A manufacturer field-return data system shows six failures were reported in the last 5 years, with a
Question:
A manufacturer field-return data system shows six failures were reported in the last 5 years, with a total estimated operating time of 939,256 hours. If it is assumed that 40% of actual field failures are returned to the manufacturer, what is the point estimate of actual field failures?
Fantastic news! We've Found the answer you've been seeking!
Step by Step Answer:
Related Book For
Safety Instrumented System Design Techniques And Design Verification
ISBN: 9781945541438
1st Edition
Authors: Iwan Van Beurden, William Goble
Question Posted: