Can a project have two paths that are critical paths? Explain why or why not. Give an
Question:
Can a project have two paths that are critical paths? Explain why or why not. Give an example if possible.
Fantastic news! We've Found the answer you've been seeking!
Step by Step Answer:
Answer rating: 75% (12 reviews)
Yes there can be two or more critical paths A critical path is defined ...View the full answer
Answered By
Jonas Araujo
I have recently received the degree of PhD. In Physics by the Universidade Federal do Maranhão after spending a term in Durham University, as I have been awarded a scholarship from a Brazilian mobility program. During my PhD. I have performed research mainly in Theoretical Physics and published works in distinguished Journals (check my ORCID: https://orcid.org/0000-0002-4324-1184).
During my BSc. I have been awarded a scholarship to study for a year in the University of Evansville, where I have worked in detection-analysis of photon correlations in the the Photonics Laboratory. There I was a tutor in Electromagnetism, Classical Mechanics and Calculus for most of that year (2012).
I am very dedicated, honest and a fast learner, but most of all, I value a job well done.
5.00+
1+ Reviews
10+ Question Solved
Related Book For
Systems Analysis and Design in a Changing World
ISBN: 978-1305117204
7th edition
Authors: John W. Satzinger, Robert B. Jackson, Stephen D. Burd
Question Posted:
Students also viewed these Computer science questions
-
Now suppose that there are M paths between the server and the client. No two paths share any link. Path k (k = 1, . . . , M ) consists of N links with transmission rates Rk1, Rk2, .. . , RkN. If the...
-
Consider Figure 1.19(b). Now suppose that there are M paths between the server and the client. Nu two paths share any link. Path k (k = 1,...,M) consists of N links with transmission rates R k 1 , R...
-
1. In business process modeling notation, a gateway is like a fork in the road, allowing the flow to go one way or another. You can learn more about gateways in the Visible Analyst Glossary feature....
-
Concentric shells r = 20 cm and r = 30 cm are held at V = 0 and V = 50, respectively. If the space between them is filled with dielectric material ( = 3.10, a = 1012 S/m), find: (a) V, E, and D, (b)...
-
Biko owns a snowmobile manufacturing business, and Miles owns a mountain bike manufacturing business. Because each business is seasonal, their manufacturing plants are idle during their respective...
-
Repeat Problem 4 - 6 but use the values 50, 100, and 150 for the standard deviation. Superimpose all three curves on a single graph.
-
Do many people annoy or irritate you? True/False LO.1
-
South Coast Boards Co. is a merchandising business. The account balances for South Coast Boards Co. as of July 1, 2010 (unless otherwise indicated), are as follows: During July, the last month of the...
-
Carrie is a resident alien of the U.S. and owns 10 percent of XYZ Corporation. During the year, Carrie moves to Canada. Is XYZ Corporation eligible for S corporation status?
-
We scored our scale to reflect external locus of control. What does that tell us about internal locus of control? Could we have scored our scale to reflect internal locus of control instead?
-
Discuss the difference between a PERT/CPM chart and a Gantt chart. List comparative advantages and disadvantages of each.
-
What is the difference between effort and duration in Microsoft Project?
-
What are the four jurisdictional bases under the UCCJEA and PKPA? Why were these laws enacted?
-
Pulleys C and D in Figure are fastened together. Weights A and B are supported by ropes wound around the pulleys as shown. The radius for pulley C is 187 mm and the radius for pulley D is 138 mm. If...
-
As a leader what are some of the thoughtful and creative ideas that you have implemented to motivate your team and increase job satisfaction?
-
A Chinese smartphone maker TECNO Ltd has provided you with a summary of its price and cost information for one of its product segments (tablets). It is based on 2018 income statement. Units produced...
-
The following projected financial data is available for the single product of Janis Ltd:- October November December Sales (unit) 50,000 65,000 65,000 Production (unit) 70,000 60,000 50,000 Opening...
-
I would appreciate freehand sketches for the top, side views, and front views. D C 6 50 B 2.75 A a 5 4 3 2 1 .45 UNLESS OTHERWISE SPECIFIED: DIMENSIONS ARE IN MILLIMETERS SURFACE FINISH: TOLERANCES:...
-
Alvarado Company produced 8,000 units of product that required 7.5 standard direct labor hours per unit. The standard fixed overhead cost per unit is $2.00 per direct labor hour at 55,000 hours,...
-
The following data are supplied for the common stocks of Nikola Corporation, Tesla, Inc. and General Motors: Nikola Corp (NKLA) Tesla Inc. (TSLA) Close Price ($) Close Price ($) 67.53 30.00 40.81...
-
Why do companies use colocation facilities?
-
List five issues that are important when considering an external hosting company.
-
Describe the primary factors that affect throughput for Internet systems.
-
Cash from Operating Activities: ______________ Cash from Investing Activities: ______________ Cash from Financing Activities: ______________ Problem 2: Financial Ratios The GAP Macys 1 Current Ratio...
-
On January 1, 2021, Winky Enterprises issued 12% bonds dated January 1, 2021, with a face amount of $2,800,000. The bonds mature in 2030 (10 years). For bonds of similar risk and maturity, the market...
-
Using the following accounts and balances, prepare the stockholders' equity vection of the balance sheet. Pilty thousand shares of common stock are authorised, and 1,000 shares have been recoured,...
Study smarter with the SolutionInn App