For the five-bus network shown in Figure 9.25, a bolted single-line-toground fault occurs at the bus 2

Question:

For the five-bus network shown in Figure 9.25, a bolted single-line-toground fault occurs at the bus 2 end of the transmission line between buses 1 and 2. The fault causes the circuit breaker at the bus 2 end of the line to open, but all other breakers remain closed. The fault is shown in Figure 9.26. Compute the subtransient fault current with the circuit breaker at the bus- 2 end of the faulted line open. Neglect prefault current and assume a prefault voltage of 1.0 per unit.

Figure 9.25

image text in transcribed

Figure 9.26

image text in transcribed

Fantastic news! We've Found the answer you've been seeking!

Step by Step Answer:

Related Book For  book-img-for-question

Power System Analysis And Design

ISBN: 9781305632134

6th Edition

Authors: J. Duncan Glover, Thomas Overbye, Mulukutla S. Sarma

Question Posted: