Rework Example 10.5 for the following faults:
(a) a threephase, permanent fault on the load side of tap 3;
(b) a single line-to-ground, permanent fault at bus 4 on the load side of the recloser; and
(c) a three-phase, permanent fault at bus 4 on the source side of the recloser.
Example 10.5
For the system of Figure 10.18, describe the operating sequence of the protective devices for the following faults:
Figure 10.18