Given here is the distribution of the actual demand of an inventory item of the Cutex Manufacturing

Question:

Given here is the distribution of the actual demand of an inventory item of the Cutex Manufacturing Company, over a long period of time.

image text in transcribed

The average lead time (with negligible variation) is 10 days.
Assuming that the distribution adequately represents the system,

(a) determine the safety stock required if it is desired to have no stockouts.

(b) determine the safety stock if it is desired to supply 95% of the DDL T (i.e. the service level is equal to 95%). Also obtain the re-order point corresponding to this.

Fantastic news! We've Found the answer you've been seeking!

Step by Step Answer:

Related Book For  book-img-for-question
Question Posted: