Subgroups of power supply units are selected once each hour from an assembly line, and the high-voltage
Question:
a. Suppose the sum of the resulting sample ranges for 30 subgroups, each consisting of four units, is 85.2. Calculate control limits for an R chart.
b. Repeat part (a) if each subgroup consists of eight units and the sum is 106.2
Fantastic news! We've Found the answer you've been seeking!
Step by Step Answer:
Related Book For
Probability And Statistics For Engineering And The Sciences
ISBN: 9781305251809
9th Edition
Authors: Jay L. Devore